After receiving the MaintenanceRequest,the VIM decides on the actions to be taken
based on maintenance policies predefined by the affected Consumer(s).
-.. [#timeout] Timeout is set by the Administrator and corresponds to the maximum time to empty the physical resources.
+.. [#timeout] Timeout is set by the Administrator and corresponds to the maximum time
+ to empty the physical resources.
.. figure:: images/figure5a.png
:name: figure5a
It consists of the following steps:
5. The Consumer C3 switches to standby configuration (STBY).
-6. Instructions from Consumers C2/C3 are shared to VIM requesting certain actions to be performed (steps 6a, 6b).
- The VIM executes the requested actions and sends back a NACK to consumer C2 (step 6d) as the
- migration of the virtual resource(s) is not completed by the given timeout.
+6. Instructions from Consumers C2/C3 are shared to VIM requesting certain actions to be performed
+ (steps 6a, 6b). The VIM executes the requested actions and sends back a NACK to consumer C2
+ (step 6d) as the migration of the virtual resource(s) is not completed by the given timeout.
7. The VIM switches the physical resources to "enabled" state.
-8. MaintenanceResponse is sent from VIM to inform the Administrator that the maintenance action cannot start.
+8. MaintenanceNotification is sent from VIM to inform the Administrator that the maintenance action
+ cannot start.
..