--- /dev/null
+
+<Project> configuration
+=======================
+Add a brief introduction to configure OPNFV with this specific installer
+
+Pre-configuration activities
+-----------------------------
+Describe specific pre-configuration activities. Refer to Installations guide and release notes
+
+Hardware configuration
+-----------------------
+Describe the hardware configuration needed for this specific installer
+
+Jumphost configuration
+-----------------------
+Describe intial Jumphost configuration (network and software)needed in order to deploy the installer
+
+Platform components configuration
+---------------------------------
+Describe the configuration of each component in the installer
+
+
+
--- /dev/null
+<Project> post installation procedures
+======================================
+Add a brief introduction to the methods of validating the installation
+according to this specific installer or feature.
+
+Automated post installation activities
+--------------------------------------
+Describe specific post installation activities performed by the OPNFV
+deployment pipeline including testing activities and reports. Refer to
+the relevant testing guides, results, and release notes.
+
+note: this section should be singular and derived from the test projects
+once we have one test suite to run for all deploy tools. This is not the
+case yet so each deploy tool will need to provide (hopefully very simillar)
+documentation of this.
+
+<Project> post configuration procedures
+--------------------------------------
+Describe any deploy tool or feature specific scripts, tests or procedures
+that should be carried out on the deployment post install and configuration
+in this section.
+
+Platform components validation
+---------------------------------
+Describe any component specific validation procedures necessary for your
+deployment tool in this section.