Issue where apex-virtual-master label node was being passed from verify
job to deploy/functest. We allow multiple verify jobs to kick off on
virtual slaves, but then passing the host down to the deploy/functest
jobs causes the deploy/functest only run 1 job at a time on the same
node, rather than running 2 jobs at a time, one on each slave.
Change-Id: I1648eb6b84f17a2b08db4d161effe977c7952d63
Signed-off-by: Tim Rozet <trozet@redhat.com>
GERRIT_REFSPEC=$GERRIT_REFSPEC
GERRIT_CHANGE_NUMBER=$GERRIT_CHANGE_NUMBER
GERRIT_CHANGE_COMMIT_MESSAGE=$GERRIT_CHANGE_COMMIT_MESSAGE
- node-parameters: true
+ node-parameters: false
kill-phase-on: FAILURE
abort-all-job: true
git-revision: true
- job-template:
name: 'apex-virtual-{stream}'
+ node: 'apex-virtual-master'
+
project-type: 'multijob'
disabled: false
- job-template:
name: 'apex-virtual-{stream}'
+ node: 'apex-virtual-master'
+
project-type: 'multijob'
disabled: false