Hardware replacement 47/3847/2
authorWei Shao <weidong.shao@huawei.com>
Tue, 1 Dec 2015 21:27:32 +0000 (21:27 +0000)
committerWeidong Shao <weidong.shao@huawei.com>
Wed, 16 Dec 2015 16:08:36 +0000 (16:08 +0000)
It must be possible to de-comision and re-commision hardware to an existing OPNFV deployment.
This is among other things needed when replacing faulty hardware.

JIRA: GENESIS-40

Change-Id: Ieeec061de5f315fcb00e73d66bfaa3fd0a49e118
Signed-off-by: Wei Shao <weidong.shao@huawei.com>
docs/sources/ux-requirements.rst

index afca5a1..faa97be 100644 (file)
@@ -100,6 +100,7 @@ System definition and system configuration requirements
 * `Jira GENESIS-25 <https://jira.opnfv.org/browse/GENESIS-25`_:
   Installers should configure NTP servers on the servers for clock
   synchronization.
+* `Jira GENESIS-40 <https://jira.opnfv.org/browse/GENESIS-40>`_: Hardware replacement
 
 Requirements pertaining to the qualities of the deployment process
 ------------------------------------------------------------------