summary |
shortlog |
log |
commit | commitdiff |
review |
tree
raw |
patch |
inline | side by side (from parent 1:
e2fd284)
Due to recent email voting results, change the PTL promotion
result in INFO. Detailed information could be found below.
https://lists.opnfv.org/pipermail/opnfv-tsc/2017-April/003422.html
Change-Id: I5c942668cbe03e697bd0865cc8aee1980afed104
Signed-off-by: yuyang <Gabriel.yuyang@huawei.com>
Repo name: bottlenecks
Project Category: Integration & Testing
Lifecycle State: Proposal approved
Repo name: bottlenecks
Project Category: Integration & Testing
Lifecycle State: Proposal approved
-Primary Contact: hongbo.tianhongbo@huawei.com
-Project Lead: hongbo.tianhongbo@huawei.com
+Primary Contact: gabriel.yuyang@huawei.com
+Project Lead: gabriel.yuyang@huawei.com
Jira Project Name: bottlenecks
Jira Project Prefix: BOTTLENECKS
Mailing List Tag: [bottlenecks]
Jira Project Name: bottlenecks
Jira Project Prefix: BOTTLENECKS
Mailing List Tag: [bottlenecks]