ETSI-NFV
========
-.. _NFV-TST001: https://docbox.etsi.org/ISG/NFV/Open/Drafts/TST001_-_Pre-deployment_Validation/
-.. _Yardsticktst: https://wiki.opnfv.org/_media/opnfv_summit_-_bridging_opnfv_and_etsi.pdf
+.. _NFV-TST001: http://www.etsi.org/deliver/etsi_gs/NFV-TST/001_099/001/01.01.01_60/gs_NFV-TST001v010101p.pdf
+.. _Yardsticktst: https://wiki.opnfv.org/download/attachments/2925202/opnfv_summit_-_bridging_opnfv_and_etsi.pdf?version=1&modificationDate=1458848320000&api=v2
The document ETSI GS NFV-TST001_, "Pre-deployment Testing; Report on Validation
:ref:`Table1 <table2_1>`, :ref:`Table2 <table2_2>` and
:ref:`Table3 <table2_3>`.
-In OPNFV Brahmaputra release, generic test cases covering aspects of the listed
+In OPNFV Colorado release, generic test cases covering aspects of the listed
metrics are available; further OPNFV releases will provide extended testing of
these metrics.
The view of available Yardstick test cases cross ETSI definitions in
| | | | |
+---------+-------------------+----------------+------------------------------+
| Compute | TC003 [1]_ | TC003 [1]_ | TC013 [1]_ |
-| | TC004 [1]_ | TC004 [1]_ | TC015 [1]_ |
+| | TC004 | TC004 | TC015 [1]_ |
| | TC014 | TC010 | |
| | TC024 | TC012 | |
-| | | | |
+| | TC069 | TC055 | |
+---------+-------------------+----------------+------------------------------+
-| Network | TC002 | TC001 | TC016 [1]_ |
-| | TC011 | TC008 | TC018 [1]_ |
-| | | TC009 | |
-| | | | |
+| Network | TC001 | TC001 | TC016 [1]_ |
+| | TC002 | TC008 | TC018 [1]_ |
+| | TC011 | TC009 | |
+| | TC073 | TC075 | |
+---------+-------------------+----------------+------------------------------+
| Storage | TC005 | TC005 | TC017 [1]_ |
-| | | | |
+| | | TC063 | |
+---------+-------------------+----------------+------------------------------+
.. note:: The description in this OPNFV document is intended as a reference for
users to understand the scope of the Yardstick Project and the
deliverables of the Yardstick framework. For complete description of
- the methodology, refer to the ETSI document.
+ the methodology, please refer to the ETSI document.
.. rubric:: Footnotes
.. [1] To be included in future deliveries.
+